이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.
규제 및 법률 · 2017. 11. 24.1 분 읽기
Notice of Extension of Time for Completion of Required Manufacturer Corrections
로컬 자동 번역 · 원본 출처 언어
요약
This notice advises the public of a request for extension of completion of a plan for notification and correction of certain manufactured homes built by Clayton Home Building Group (Clayton) that were installed with a certain Tub-Shower Faucet diverter valve manufactured by StoneCrest. The affected diverter model is N8126C. In accordance with Title 24 Code of Federal Regulations 3282.410(c), the Department has reviewed Clayton's request and has determined that Clayton has shown good cause for an extension.
원본 출처 언어: Federal Register — All Documents원문 발표 열기 →