BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2017/11/241 分钟阅读

Notice of Extension of Time for Completion of Required Manufacturer Corrections

本地自动翻译 · 来源原始语言

摘要

This notice advises the public of a request for extension of completion of a plan for notification and correction of certain manufactured homes built by Clayton Home Building Group (Clayton) that were installed with a certain Tub-Shower Faucet diverter valve manufactured by StoneCrest. The affected diverter model is N8126C. In accordance with Title 24 Code of Federal Regulations 3282.410(c), the Department has reviewed Clayton's request and has determined that Clayton has shown good cause for an extension.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →