BN Business News
Bedrijf toevoegen →
Deze vertaling wordt voorbereid. Voorlopig tonen we de oorspronkelijke Engelse versie.

Regelgeving en recht · 24-11-20171 min lezen

Notice of Extension of Time for Completion of Required Manufacturer Corrections

Lokale automatische vertaling · Oorspronkelijke brontaal

Samenvatting

This notice advises the public of a request for extension of completion of a plan for notification and correction of certain manufactured homes built by Clayton Home Building Group (Clayton) that were installed with a certain Tub-Shower Faucet diverter valve manufactured by StoneCrest. The affected diverter model is N8126C. In accordance with Title 24 Code of Federal Regulations 3282.410(c), the Department has reviewed Clayton's request and has determined that Clayton has shown good cause for an extension.

Oorspronkelijke brontaal: Federal Register — All DocumentsOrigineel bericht openen →