この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。
規制と法律 · 2017/11/241 分で読めます
Notice of Extension of Time for Completion of Required Manufacturer Corrections
ローカル自動翻訳 · 情報源の原言語
概要
This notice advises the public of a request for extension of completion of a plan for notification and correction of certain manufactured homes built by Clayton Home Building Group (Clayton) that were installed with a certain Tub-Shower Faucet diverter valve manufactured by StoneCrest. The affected diverter model is N8126C. In accordance with Title 24 Code of Federal Regulations 3282.410(c), the Department has reviewed Clayton's request and has determined that Clayton has shown good cause for an extension.
情報源の原言語: Federal Register — All Documents原文の発表を開く →