BN Business News
Şirketinizi ekleyin →
Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.

Düzenleme ve hukuk · 24.11.20171 dk okuma

Notice of Extension of Time for Completion of Required Manufacturer Corrections

Yerel otomatik çeviri · Kaynağın orijinal dili

Özet

This notice advises the public of a request for extension of completion of a plan for notification and correction of certain manufactured homes built by Clayton Home Building Group (Clayton) that were installed with a certain Tub-Shower Faucet diverter valve manufactured by StoneCrest. The affected diverter model is N8126C. In accordance with Title 24 Code of Federal Regulations 3282.410(c), the Department has reviewed Clayton's request and has determined that Clayton has shown good cause for an extension.

Kaynağın orijinal dili: Federal Register — All DocumentsOrijinal duyuruyu açın →