Diese Übersetzung wird noch vorbereitet. Bis dahin zeigen wir vorübergehend die englische Originalversion.
Regulierung & Recht · 24.11.20171 Min. Lesezeit
Notice of Extension of Time for Completion of Required Manufacturer Corrections
Lokale automatische Übersetzung · Originalsprache der Quelle
Zusammenfassung
This notice advises the public of a request for extension of completion of a plan for notification and correction of certain manufactured homes built by Clayton Home Building Group (Clayton) that were installed with a certain Tub-Shower Faucet diverter valve manufactured by StoneCrest. The affected diverter model is N8126C. In accordance with Title 24 Code of Federal Regulations 3282.410(c), the Department has reviewed Clayton's request and has determined that Clayton has shown good cause for an extension.
Originalsprache der Quelle: Federal Register — All DocumentsOriginalquelle öffnen →