تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.
التنظيم والقانون · 24/11/20171 دقائق للقراءة
Notice of Extension of Time for Completion of Required Manufacturer Corrections
ترجمة آلية محلية · اللغة الأصلية للمصدر
الملخص
This notice advises the public of a request for extension of completion of a plan for notification and correction of certain manufactured homes built by Clayton Home Building Group (Clayton) that were installed with a certain Tub-Shower Faucet diverter valve manufactured by StoneCrest. The affected diverter model is N8126C. In accordance with Title 24 Code of Federal Regulations 3282.410(c), the Department has reviewed Clayton's request and has determined that Clayton has shown good cause for an extension.
اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →