BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 24/11/20171 min de lecture

Notice of Extension of Time for Completion of Required Manufacturer Corrections

Traduction automatique locale · Langue originale de la source

Résumé

This notice advises the public of a request for extension of completion of a plan for notification and correction of certain manufactured homes built by Clayton Home Building Group (Clayton) that were installed with a certain Tub-Shower Faucet diverter valve manufactured by StoneCrest. The affected diverter model is N8126C. In accordance with Title 24 Code of Federal Regulations 3282.410(c), the Department has reviewed Clayton's request and has determined that Clayton has shown good cause for an extension.

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →