이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.
규제 및 법률 · 2006. 11. 28.1 분 읽기
Medical: Informed Consent-Extension of Time Period and Modification of Witness Requirement for Signature Consent
로컬 자동 번역 · 원본 출처 언어
요약
This document adopts as a final rule the proposed rule amending the Department of Veterans Affairs (VA) medical regulations on informed consent. This final rule extends the period of time during which a signed consent form remains valid from 30 to 60 days and eliminates the requirement that a third-party witness the patient or surrogate and practitioner signing the consent form, except in those circumstances where the patient or surrogate signs with an "X" due to a debilitating illness or disability, i.e., significant physical impairment and/or difficulty in executing a signature due to an underlying health condition(s), or is unable to read and write.
원본 출처 언어: Federal Register — All Documents원문 발표 열기 →