BN Business News
会社を追加 →
この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。

規制と法律 · 2006/11/281 分で読めます

Medical: Informed Consent-Extension of Time Period and Modification of Witness Requirement for Signature Consent

ローカル自動翻訳 · 情報源の原言語

概要

This document adopts as a final rule the proposed rule amending the Department of Veterans Affairs (VA) medical regulations on informed consent. This final rule extends the period of time during which a signed consent form remains valid from 30 to 60 days and eliminates the requirement that a third-party witness the patient or surrogate and practitioner signing the consent form, except in those circumstances where the patient or surrogate signs with an "X" due to a debilitating illness or disability, i.e., significant physical impairment and/or difficulty in executing a signature due to an underlying health condition(s), or is unable to read and write.

情報源の原言語: Federal Register — All Documents原文の発表を開く →

関連インサイト

ビジネスインサイト →