BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 28‏/11‏/20061 دقائق للقراءة

Medical: Informed Consent-Extension of Time Period and Modification of Witness Requirement for Signature Consent

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

This document adopts as a final rule the proposed rule amending the Department of Veterans Affairs (VA) medical regulations on informed consent. This final rule extends the period of time during which a signed consent form remains valid from 30 to 60 days and eliminates the requirement that a third-party witness the patient or surrogate and practitioner signing the consent form, except in those circumstances where the patient or surrogate signs with an "X" due to a debilitating illness or disability, i.e., significant physical impairment and/or difficulty in executing a signature due to an underlying health condition(s), or is unable to read and write.

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →