BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Regulação e direito · 28/11/20061 min de leitura

Medical: Informed Consent-Extension of Time Period and Modification of Witness Requirement for Signature Consent

Tradução automática local · Idioma original da fonte

Resumo

This document adopts as a final rule the proposed rule amending the Department of Veterans Affairs (VA) medical regulations on informed consent. This final rule extends the period of time during which a signed consent form remains valid from 30 to 60 days and eliminates the requirement that a third-party witness the patient or surrogate and practitioner signing the consent form, except in those circumstances where the patient or surrogate signs with an "X" due to a debilitating illness or disability, i.e., significant physical impairment and/or difficulty in executing a signature due to an underlying health condition(s), or is unable to read and write.

Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →

Explorar análises

Análises empresariais →