本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2006/11/281 分钟阅读
Medical: Informed Consent-Extension of Time Period and Modification of Witness Requirement for Signature Consent
本地自动翻译 · 来源原始语言
摘要
This document adopts as a final rule the proposed rule amending the Department of Veterans Affairs (VA) medical regulations on informed consent. This final rule extends the period of time during which a signed consent form remains valid from 30 to 60 days and eliminates the requirement that a third-party witness the patient or surrogate and practitioner signing the consent form, except in those circumstances where the patient or surrogate signs with an "X" due to a debilitating illness or disability, i.e., significant physical impairment and/or difficulty in executing a signature due to an underlying health condition(s), or is unable to read and write.
来源原始语言: Federal Register — All Documents打开原始公告 →