BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 28/11/20061 min de lectura

Medical: Informed Consent-Extension of Time Period and Modification of Witness Requirement for Signature Consent

Traducción automática local · Idioma original de la fuente

Resumen

This document adopts as a final rule the proposed rule amending the Department of Veterans Affairs (VA) medical regulations on informed consent. This final rule extends the period of time during which a signed consent form remains valid from 30 to 60 days and eliminates the requirement that a third-party witness the patient or surrogate and practitioner signing the consent form, except in those circumstances where the patient or surrogate signs with an "X" due to a debilitating illness or disability, i.e., significant physical impairment and/or difficulty in executing a signature due to an underlying health condition(s), or is unable to read and write.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →