本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2006/10/21 分钟阅读
Oil Country Tubular Goods from Italy: Extension of Time Limit for Final Results of Expedited Five-year (Sunset) Review of Countervailing Duty Order
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce ("the Department") is extending the time limit for its final results in the expedited sunset review of the countervailing duty (CVD) order on oil country tubular goods (OCTG) from Italy. As a result of this extension, the Department intends to issue the final results of the sunset review no later than December 19, 2005.
来源原始语言: Federal Register — All Documents打开原始公告 →