Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.
Düzenleme ve hukuk · 02.10.20061 dk okuma
Oil Country Tubular Goods from Italy: Extension of Time Limit for Final Results of Expedited Five-year (Sunset) Review of Countervailing Duty Order
Yerel otomatik çeviri · Kaynağın orijinal dili
Özet
The Department of Commerce ("the Department") is extending the time limit for its final results in the expedited sunset review of the countervailing duty (CVD) order on oil country tubular goods (OCTG) from Italy. As a result of this extension, the Department intends to issue the final results of the sunset review no later than December 19, 2005.
Kaynağın orijinal dili: Federal Register — All DocumentsOrijinal duyuruyu açın →