この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。
規制と法律 · 2006/10/21 分で読めます
Oil Country Tubular Goods from Italy: Extension of Time Limit for Final Results of Expedited Five-year (Sunset) Review of Countervailing Duty Order
ローカル自動翻訳 · 情報源の原言語
概要
The Department of Commerce ("the Department") is extending the time limit for its final results in the expedited sunset review of the countervailing duty (CVD) order on oil country tubular goods (OCTG) from Italy. As a result of this extension, the Department intends to issue the final results of the sunset review no later than December 19, 2005.
情報源の原言語: Federal Register — All Documents原文の発表を開く →