BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Regulação e direito · 02/10/20061 min de leitura

Oil Country Tubular Goods from Italy: Extension of Time Limit for Final Results of Expedited Five-year (Sunset) Review of Countervailing Duty Order

Tradução automática local · Idioma original da fonte

Resumo

The Department of Commerce ("the Department") is extending the time limit for its final results in the expedited sunset review of the countervailing duty (CVD) order on oil country tubular goods (OCTG) from Italy. As a result of this extension, the Department intends to issue the final results of the sunset review no later than December 19, 2005.

Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →

Explorar análises

Análises empresariais →