Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 02/10/20061 min de lecture
Oil Country Tubular Goods from Italy: Extension of Time Limit for Final Results of Expedited Five-year (Sunset) Review of Countervailing Duty Order
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce ("the Department") is extending the time limit for its final results in the expedited sunset review of the countervailing duty (CVD) order on oil country tubular goods (OCTG) from Italy. As a result of this extension, the Department intends to issue the final results of the sunset review no later than December 19, 2005.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →