BN Business News
Bedrijf toevoegen →
Deze vertaling wordt voorbereid. Voorlopig tonen we de oorspronkelijke Engelse versie.

Regelgeving en recht · 2-10-20061 min lezen

Oil Country Tubular Goods from Italy: Extension of Time Limit for Final Results of Expedited Five-year (Sunset) Review of Countervailing Duty Order

Lokale automatische vertaling · Oorspronkelijke brontaal

Samenvatting

The Department of Commerce ("the Department") is extending the time limit for its final results in the expedited sunset review of the countervailing duty (CVD) order on oil country tubular goods (OCTG) from Italy. As a result of this extension, the Department intends to issue the final results of the sunset review no later than December 19, 2005.

Oorspronkelijke brontaal: Federal Register — All DocumentsOrigineel bericht openen →