이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.
규제 및 법률 · 1998. 12. 17.1 분 읽기
Cut-to-Length Carbon Steel Plate from Belgium; Extension of Time Limit for Countervailing Duty Administrative Review
로컬 자동 번역 · 원본 출처 언어
요약
The Department of Commerce (the Department) is extending the time limit for the final results of the first administrative review of the countervailing duty order on cut-to-length carbon steel plate from Belgium. The review covers one manufacturer/exporter and the period January 1, 1996 through December 31, 1996.
원본 출처 언어: Federal Register — All Documents원문 발표 열기 →