Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.
Regulação e direito · 17/12/19981 min de leitura
Cut-to-Length Carbon Steel Plate from Belgium; Extension of Time Limit for Countervailing Duty Administrative Review
Tradução automática local · Idioma original da fonte
Resumo
The Department of Commerce (the Department) is extending the time limit for the final results of the first administrative review of the countervailing duty order on cut-to-length carbon steel plate from Belgium. The review covers one manufacturer/exporter and the period January 1, 1996 through December 31, 1996.
Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →