本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 1998/12/171 分钟阅读
Cut-to-Length Carbon Steel Plate from Belgium; Extension of Time Limit for Countervailing Duty Administrative Review
本地自动翻译 · 来源原始语言
摘要
The Department of Commerce (the Department) is extending the time limit for the final results of the first administrative review of the countervailing duty order on cut-to-length carbon steel plate from Belgium. The review covers one manufacturer/exporter and the period January 1, 1996 through December 31, 1996.
来源原始语言: Federal Register — All Documents打开原始公告 →