BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 17/12/19981 min de lectura

Cut-to-Length Carbon Steel Plate from Belgium; Extension of Time Limit for Countervailing Duty Administrative Review

Traducción automática local · Idioma original de la fuente

Resumen

The Department of Commerce (the Department) is extending the time limit for the final results of the first administrative review of the countervailing duty order on cut-to-length carbon steel plate from Belgium. The review covers one manufacturer/exporter and the period January 1, 1996 through December 31, 1996.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →