Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 17/12/19981 min de lecture
Cut-to-Length Carbon Steel Plate from Belgium; Extension of Time Limit for Countervailing Duty Administrative Review
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce (the Department) is extending the time limit for the final results of the first administrative review of the countervailing duty order on cut-to-length carbon steel plate from Belgium. The review covers one manufacturer/exporter and the period January 1, 1996 through December 31, 1996.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →