BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2018/3/191 分钟阅读

Notice of Availability of a Final Environmental Assessment for the Otay Mesa USDA Plant Inspection Station

本地自动翻译 · 来源原始语言

摘要

We are advising the public that GSA has prepared a Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the construction of the proposed U.S. Department of Agriculture (USDA) Animal and Plant Health Inspection Service (APHIS) Plant Inspection Station (PIS), adjacent to the existing Otay Mesa Land Port of Entry (LPOE) in Otay Mesa, San Diego County, California. Based on its finding of no significant impacts, GSA has determined that an Environmental Impact Statement need not be prepared.

来源原始语言: Federal Register — General Services Administration打开原始公告 →

探索专题

商业洞察 →