BN Business News
会社を追加 →
この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。

規制と法律 · 2018/3/191 分で読めます

Notice of Availability of a Final Environmental Assessment for the Otay Mesa USDA Plant Inspection Station

ローカル自動翻訳 · 情報源の原言語

概要

We are advising the public that GSA has prepared a Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the construction of the proposed U.S. Department of Agriculture (USDA) Animal and Plant Health Inspection Service (APHIS) Plant Inspection Station (PIS), adjacent to the existing Otay Mesa Land Port of Entry (LPOE) in Otay Mesa, San Diego County, California. Based on its finding of no significant impacts, GSA has determined that an Environmental Impact Statement need not be prepared.

情報源の原言語: Federal Register — General Services Administration原文の発表を開く →

関連インサイト

ビジネスインサイト →