BN Business News
Şirketinizi ekleyin →
Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.

Düzenleme ve hukuk · 19.03.20181 dk okuma

Notice of Availability of a Final Environmental Assessment for the Otay Mesa USDA Plant Inspection Station

Yerel otomatik çeviri · Kaynağın orijinal dili

Özet

We are advising the public that GSA has prepared a Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the construction of the proposed U.S. Department of Agriculture (USDA) Animal and Plant Health Inspection Service (APHIS) Plant Inspection Station (PIS), adjacent to the existing Otay Mesa Land Port of Entry (LPOE) in Otay Mesa, San Diego County, California. Based on its finding of no significant impacts, GSA has determined that an Environmental Impact Statement need not be prepared.

Kaynağın orijinal dili: Federal Register — General Services AdministrationOrijinal duyuruyu açın →