BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Regolamentazione e diritto · 19/03/20181 min di lettura

Notice of Availability of a Final Environmental Assessment for the Otay Mesa USDA Plant Inspection Station

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

We are advising the public that GSA has prepared a Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the construction of the proposed U.S. Department of Agriculture (USDA) Animal and Plant Health Inspection Service (APHIS) Plant Inspection Station (PIS), adjacent to the existing Otay Mesa Land Port of Entry (LPOE) in Otay Mesa, San Diego County, California. Based on its finding of no significant impacts, GSA has determined that an Environmental Impact Statement need not be prepared.

Lingua originale della fonte: Federal Register — General Services AdministrationApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →