BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Regulação e direito · 19/03/20181 min de leitura

Notice of Availability of a Final Environmental Assessment for the Otay Mesa USDA Plant Inspection Station

Tradução automática local · Idioma original da fonte

Resumo

We are advising the public that GSA has prepared a Final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the construction of the proposed U.S. Department of Agriculture (USDA) Animal and Plant Health Inspection Service (APHIS) Plant Inspection Station (PIS), adjacent to the existing Otay Mesa Land Port of Entry (LPOE) in Otay Mesa, San Diego County, California. Based on its finding of no significant impacts, GSA has determined that an Environmental Impact Statement need not be prepared.

Idioma original da fonte: Federal Register — General Services AdministrationAbrir o comunicado original →

Explorar análises

Análises empresariais →