BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

에너지 및 환경 · 2024. 10. 25.1 분 읽기

Extension of Time-Limited Tolerances for Emergency Exemptions

로컬 자동 번역 · 원본 출처 언어

요약

This regulation extends time-limited tolerances for residues of the pesticides sodium salt of acifluorfen in or on Beet, sugar, roots and Beet, sugar, leaves; thiamethoxam in or on Rice, grain and Rice, straw; and clothianidin in or on Rice, grain. These actions are in response to EPA's granting of emergency exemptions under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) authorizing use of these pesticides. In addition, the Federal Food, Drug, and Cosmetic Act (FFDCA) requires EPA to establish a time-limited tolerance or exemption from the requirement for a tolerance for pesticide chemical residues in food that will result from the use of a pesticide under an emergency exemption granted by EPA.

원본 출처 언어: Federal Register — Environmental Protection Agency원문 발표 열기 →