BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Energia e ambiente · 25/10/20241 min di lettura

Extension of Time-Limited Tolerances for Emergency Exemptions

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

This regulation extends time-limited tolerances for residues of the pesticides sodium salt of acifluorfen in or on Beet, sugar, roots and Beet, sugar, leaves; thiamethoxam in or on Rice, grain and Rice, straw; and clothianidin in or on Rice, grain. These actions are in response to EPA's granting of emergency exemptions under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) authorizing use of these pesticides. In addition, the Federal Food, Drug, and Cosmetic Act (FFDCA) requires EPA to establish a time-limited tolerance or exemption from the requirement for a tolerance for pesticide chemical residues in food that will result from the use of a pesticide under an emergency exemption granted by EPA.

Lingua originale della fonte: Federal Register — Environmental Protection AgencyApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →