BN Business News
Unternehmen hinzufügen →
Diese Übersetzung wird noch vorbereitet. Bis dahin zeigen wir vorübergehend die englische Originalversion.

Energie & Umwelt · 25.10.20241 Min. Lesezeit

Extension of Time-Limited Tolerances for Emergency Exemptions

Lokale automatische Übersetzung · Originalsprache der Quelle

Zusammenfassung

This regulation extends time-limited tolerances for residues of the pesticides sodium salt of acifluorfen in or on Beet, sugar, roots and Beet, sugar, leaves; thiamethoxam in or on Rice, grain and Rice, straw; and clothianidin in or on Rice, grain. These actions are in response to EPA's granting of emergency exemptions under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) authorizing use of these pesticides. In addition, the Federal Food, Drug, and Cosmetic Act (FFDCA) requires EPA to establish a time-limited tolerance or exemption from the requirement for a tolerance for pesticide chemical residues in food that will result from the use of a pesticide under an emergency exemption granted by EPA.

Originalsprache der Quelle: Federal Register — Environmental Protection AgencyOriginalquelle öffnen →

Weitere Themen

Business-Analysen →