BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Énergie et environnement · 25/10/20241 min de lecture

Extension of Time-Limited Tolerances for Emergency Exemptions

Traduction automatique locale · Langue originale de la source

Résumé

This regulation extends time-limited tolerances for residues of the pesticides sodium salt of acifluorfen in or on Beet, sugar, roots and Beet, sugar, leaves; thiamethoxam in or on Rice, grain and Rice, straw; and clothianidin in or on Rice, grain. These actions are in response to EPA's granting of emergency exemptions under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) authorizing use of these pesticides. In addition, the Federal Food, Drug, and Cosmetic Act (FFDCA) requires EPA to establish a time-limited tolerance or exemption from the requirement for a tolerance for pesticide chemical residues in food that will result from the use of a pesticide under an emergency exemption granted by EPA.

Langue originale de la source: Federal Register — Environmental Protection AgencyOuvrir le communiqué original →

Explorer les analyses

Analyses business →