BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

규제 및 법률 · 2019. 9. 5.1 분 읽기

Notice of Availability of Final Environmental Assessment and Finding of No Significant Impact for the Proposed Construction of Railroad Bridges Across Sand Creek and Lake Pend Oreille at Sandpoint, Bonner County, Idaho

로컬 자동 번역 · 원본 출처 언어

요약

The United States Coast Guard (USCG) announces the availability of a Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) in accordance with National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.) and the National Historic Preservation Act (NHPA), as amended (16 U.S.C. 470 et seq.) for the proposed construction of railroad bridges across Lake Pend Oreille and Sand Creek at Sandpoint, Bonner County, Idaho. The proposed bridges will be built parallel to existing railroad bridges crossing the same waterbodies. As structures over navigable waters of the United States, the proposed bridges require a Coast Guard Bridge Permit. This notice provides information on where to view the FEA and FONSI. There is no comment period associated with this notice.

원본 출처 언어: Federal Register — All Documents원문 발표 열기 →