BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 5/9/20191 min de lectura

Notice of Availability of Final Environmental Assessment and Finding of No Significant Impact for the Proposed Construction of Railroad Bridges Across Sand Creek and Lake Pend Oreille at Sandpoint, Bonner County, Idaho

Traducción automática local · Idioma original de la fuente

Resumen

The United States Coast Guard (USCG) announces the availability of a Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) in accordance with National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.) and the National Historic Preservation Act (NHPA), as amended (16 U.S.C. 470 et seq.) for the proposed construction of railroad bridges across Lake Pend Oreille and Sand Creek at Sandpoint, Bonner County, Idaho. The proposed bridges will be built parallel to existing railroad bridges crossing the same waterbodies. As structures over navigable waters of the United States, the proposed bridges require a Coast Guard Bridge Permit. This notice provides information on where to view the FEA and FONSI. There is no comment period associated with this notice.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →