BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 05/09/20191 min de lecture

Notice of Availability of Final Environmental Assessment and Finding of No Significant Impact for the Proposed Construction of Railroad Bridges Across Sand Creek and Lake Pend Oreille at Sandpoint, Bonner County, Idaho

Traduction automatique locale · Langue originale de la source

Résumé

The United States Coast Guard (USCG) announces the availability of a Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) in accordance with National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.) and the National Historic Preservation Act (NHPA), as amended (16 U.S.C. 470 et seq.) for the proposed construction of railroad bridges across Lake Pend Oreille and Sand Creek at Sandpoint, Bonner County, Idaho. The proposed bridges will be built parallel to existing railroad bridges crossing the same waterbodies. As structures over navigable waters of the United States, the proposed bridges require a Coast Guard Bridge Permit. This notice provides information on where to view the FEA and FONSI. There is no comment period associated with this notice.

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →