BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2019/9/51 分钟阅读

Notice of Availability of Final Environmental Assessment and Finding of No Significant Impact for the Proposed Construction of Railroad Bridges Across Sand Creek and Lake Pend Oreille at Sandpoint, Bonner County, Idaho

本地自动翻译 · 来源原始语言

摘要

The United States Coast Guard (USCG) announces the availability of a Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) in accordance with National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.) and the National Historic Preservation Act (NHPA), as amended (16 U.S.C. 470 et seq.) for the proposed construction of railroad bridges across Lake Pend Oreille and Sand Creek at Sandpoint, Bonner County, Idaho. The proposed bridges will be built parallel to existing railroad bridges crossing the same waterbodies. As structures over navigable waters of the United States, the proposed bridges require a Coast Guard Bridge Permit. This notice provides information on where to view the FEA and FONSI. There is no comment period associated with this notice.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →