이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.
규제 및 법률 · 2005. 11. 15.1 분 읽기
Solicitation of Interest for New Transmission Capacity Between Wyoming and Colorado
로컬 자동 번역 · 원본 출처 언어
요약
The electricity corridor between southeastern Wyoming and northeastern Colorado has experienced a transmission constraint for a number of years. This constraint is designated in the Western Electricity Coordinating Council's Path Rating Catalog and referenced in this notice as "TOT 3." To examine possibilities for relieving the TOT 3 constraint, the Western Area Power Administration (Western) has entered into a Memorandum of Understanding (MOU) with the Wyoming Infrastructure Authority (WIA) and Trans-Elect, Inc. (Trans-Elect). Under this MOU, Western is soliciting expressions of interest from entities desiring transmission rights on a new line potentially to be built across TOT 3.
원본 출처 언어: Federal Register — All Documents원문 발표 열기 →