本文翻译正在准备中。在此之前,我们暂时显示英文原文。
监管与法律 · 2005/11/151 分钟阅读
Solicitation of Interest for New Transmission Capacity Between Wyoming and Colorado
本地自动翻译 · 来源原始语言
摘要
The electricity corridor between southeastern Wyoming and northeastern Colorado has experienced a transmission constraint for a number of years. This constraint is designated in the Western Electricity Coordinating Council's Path Rating Catalog and referenced in this notice as "TOT 3." To examine possibilities for relieving the TOT 3 constraint, the Western Area Power Administration (Western) has entered into a Memorandum of Understanding (MOU) with the Wyoming Infrastructure Authority (WIA) and Trans-Elect, Inc. (Trans-Elect). Under this MOU, Western is soliciting expressions of interest from entities desiring transmission rights on a new line potentially to be built across TOT 3.
来源原始语言: Federal Register — All Documents打开原始公告 →