BN Business News
Добавить компанию →
Этот перевод готовится. Пока мы временно показываем оригинальную версию на английском языке.

Регулирование и право · 15.11.20051 мин чтения

Solicitation of Interest for New Transmission Capacity Between Wyoming and Colorado

Локальный автоматический перевод · Язык оригинального источника

Краткое содержание

The electricity corridor between southeastern Wyoming and northeastern Colorado has experienced a transmission constraint for a number of years. This constraint is designated in the Western Electricity Coordinating Council's Path Rating Catalog and referenced in this notice as "TOT 3." To examine possibilities for relieving the TOT 3 constraint, the Western Area Power Administration (Western) has entered into a Memorandum of Understanding (MOU) with the Wyoming Infrastructure Authority (WIA) and Trans-Elect, Inc. (Trans-Elect). Under this MOU, Western is soliciting expressions of interest from entities desiring transmission rights on a new line potentially to be built across TOT 3.

Язык оригинального источника: Federal Register — All DocumentsОткрыть исходное сообщение →

Другие тематические подборки

Деловая аналитика →