BN Business News
Şirketinizi ekleyin →
Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.

Düzenleme ve hukuk · 15.11.20051 dk okuma

Solicitation of Interest for New Transmission Capacity Between Wyoming and Colorado

Yerel otomatik çeviri · Kaynağın orijinal dili

Özet

The electricity corridor between southeastern Wyoming and northeastern Colorado has experienced a transmission constraint for a number of years. This constraint is designated in the Western Electricity Coordinating Council's Path Rating Catalog and referenced in this notice as "TOT 3." To examine possibilities for relieving the TOT 3 constraint, the Western Area Power Administration (Western) has entered into a Memorandum of Understanding (MOU) with the Wyoming Infrastructure Authority (WIA) and Trans-Elect, Inc. (Trans-Elect). Under this MOU, Western is soliciting expressions of interest from entities desiring transmission rights on a new line potentially to be built across TOT 3.

Kaynağın orijinal dili: Federal Register — All DocumentsOrijinal duyuruyu açın →