BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

규제 및 법률 · 1996. 10. 25.1 분 읽기

Color Picture Tubes from Japan; Extension of Time Limit of Antidumping Duty Administrative Review

로컬 자동 번역 · 원본 출처 언어

요약

The Department of Commerce (the Department) is extending the time limit for preliminary results in the administrative review of the antidumping duty order on color picture tubes (CPTs) from Japan, covering the period January 1, 1995, through December 31, 1995, because it is not practicable to complete the review within the time limits mandated by the Tariff Act of 1930 (the Act), as amended, 19 U.S.C. 1675(a)(3)(A).

원본 출처 언어: Federal Register — All Documents원문 발표 열기 →