BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 1996/10/251 分钟阅读

Color Picture Tubes from Japan; Extension of Time Limit of Antidumping Duty Administrative Review

本地自动翻译 · 来源原始语言

摘要

The Department of Commerce (the Department) is extending the time limit for preliminary results in the administrative review of the antidumping duty order on color picture tubes (CPTs) from Japan, covering the period January 1, 1995, through December 31, 1995, because it is not practicable to complete the review within the time limits mandated by the Tariff Act of 1930 (the Act), as amended, 19 U.S.C. 1675(a)(3)(A).

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →