Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 25/10/19961 min de lecture
Color Picture Tubes from Japan; Extension of Time Limit of Antidumping Duty Administrative Review
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce (the Department) is extending the time limit for preliminary results in the administrative review of the antidumping duty order on color picture tubes (CPTs) from Japan, covering the period January 1, 1995, through December 31, 1995, because it is not practicable to complete the review within the time limits mandated by the Tariff Act of 1930 (the Act), as amended, 19 U.S.C. 1675(a)(3)(A).
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →