Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.
Regulação e direito · 25/10/19961 min de leitura
Color Picture Tubes from Japan; Extension of Time Limit of Antidumping Duty Administrative Review
Tradução automática local · Idioma original da fonte
Resumo
The Department of Commerce (the Department) is extending the time limit for preliminary results in the administrative review of the antidumping duty order on color picture tubes (CPTs) from Japan, covering the period January 1, 1995, through December 31, 1995, because it is not practicable to complete the review within the time limits mandated by the Tariff Act of 1930 (the Act), as amended, 19 U.S.C. 1675(a)(3)(A).
Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →