BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2002/10/31 分钟阅读

Drawbridge Operation Regulations; Gasparilla Island Causeway Swingbridge, Gulf Intracoastal Waterway, Boca Grande, Charlotte County, FL

本地自动翻译 · 来源原始语言

摘要

The Commander, Seventh Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Gasparilla Island Causeway Swingbridge, across the Gulf Intracoastal Waterway, mile 34.3, at Boca Grande, Florida. This deviation allows the bridge to remain in the closed position from 7 p.m. on October 14, 2002, until 7 a.m. on October 15, 2002, and from 7 p.m. on October 15, 2002 until 7 a.m. on October 16, 2002. This temporary deviation is required to allow the bridge owner to safely complete emergency replacement of the bridge couplings.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →