この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。
規制と法律 · 2002/10/31 分で読めます
Drawbridge Operation Regulations; Gasparilla Island Causeway Swingbridge, Gulf Intracoastal Waterway, Boca Grande, Charlotte County, FL
ローカル自動翻訳 · 情報源の原言語
概要
The Commander, Seventh Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Gasparilla Island Causeway Swingbridge, across the Gulf Intracoastal Waterway, mile 34.3, at Boca Grande, Florida. This deviation allows the bridge to remain in the closed position from 7 p.m. on October 14, 2002, until 7 a.m. on October 15, 2002, and from 7 p.m. on October 15, 2002 until 7 a.m. on October 16, 2002. This temporary deviation is required to allow the bridge owner to safely complete emergency replacement of the bridge couplings.
情報源の原言語: Federal Register — All Documents原文の発表を開く →