BN Business News
أضف شركتك →
تجري حاليًا ترجمة هذا المقال. نعرض مؤقتًا النسخة الأصلية باللغة الإنجليزية.

التنظيم والقانون · 3‏/10‏/20021 دقائق للقراءة

Drawbridge Operation Regulations; Gasparilla Island Causeway Swingbridge, Gulf Intracoastal Waterway, Boca Grande, Charlotte County, FL

ترجمة آلية محلية · اللغة الأصلية للمصدر

الملخص

The Commander, Seventh Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Gasparilla Island Causeway Swingbridge, across the Gulf Intracoastal Waterway, mile 34.3, at Boca Grande, Florida. This deviation allows the bridge to remain in the closed position from 7 p.m. on October 14, 2002, until 7 a.m. on October 15, 2002, and from 7 p.m. on October 15, 2002 until 7 a.m. on October 16, 2002. This temporary deviation is required to allow the bridge owner to safely complete emergency replacement of the bridge couplings.

اللغة الأصلية للمصدر: Federal Register — All Documentsافتح البيان الأصلي →

استكشف الموضوعات

تحليلات الأعمال →