BN Business News
Додати компанію →
Цей переклад готується. Тимчасово ми показуємо оригінальну версію англійською мовою.

Регулювання та право · 03.10.20021 хв читання

Drawbridge Operation Regulations; Gasparilla Island Causeway Swingbridge, Gulf Intracoastal Waterway, Boca Grande, Charlotte County, FL

Локальний автоматичний переклад · Оригінальна мова джерела

Короткий зміст

The Commander, Seventh Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Gasparilla Island Causeway Swingbridge, across the Gulf Intracoastal Waterway, mile 34.3, at Boca Grande, Florida. This deviation allows the bridge to remain in the closed position from 7 p.m. on October 14, 2002, until 7 a.m. on October 15, 2002, and from 7 p.m. on October 15, 2002 until 7 a.m. on October 16, 2002. This temporary deviation is required to allow the bridge owner to safely complete emergency replacement of the bridge couplings.

Оригінальна мова джерела: Federal Register — All DocumentsВідкрити оригінальне повідомлення →

Інші тематичні добірки

Ділова аналітика →